6 Mar 2008

Washington Primary Care Centre

South Elevation

Week 38 of 60.

South Elevation taken from outside main waiting area. Full height Velfac windows are in place. Solar shading will be fitted between vertical CHS posts to reduce solar gain from southern aspect. Internally, full height, electically operated blinds will also be fitted. Wind catchers are to be mounted on the roof to provide natural ventilation to the main waiting area.

Post a comment

You must be logged in to post a comment.