13 Feb 2008

Royston Lifelong learning centre

royston-main.jpg

Wk 26 of the Contract and work is being completed to the flat roofs and purlins, prior to the kingspan panels arrival on site. The facing brick is nearly complete, with blockwork continuing from first floor to eaves, this will provide a substrate for the timber cladding to the first floor.

1 Comment

  1. 21 Feb 2008 @ 7:34 pm Chris Potter said:

    Wow a real building. Great to keep posting construction shots on the blog. Can you give me the info on the biomass, I’m trying to keep a track of all the similar stuff we’re doing/