Royston Lifelong Learning Centre
Wk 13 the Steel frame is nearly complete. The positioning and some aspects of the design have had to be carried over from the original planning application prior to our envolvment. The Rotunda shown below here will eventually house the IT learning facilities as a part of the main Library.